12-15 May, 2019

IEC, 15, Brovarsky Prospect
Kyiv, Ukraine

News

16 April 2014

In 2014, Kyivenergo will replace 45 km of heating systems to the energy saving plastic


PJSC "Kyivenergo" in 2014, taking into account the poor technical condition of heat distribution networks of district heating and hot water, as well as networks of large diameter (trunk) in Kyiv, plans to replace about 100 km networks. This was told in the press service of the company.

Of these, about half, or 45 km, would be replaced with modern technology gasket pre-insulated energy saving plastic pipes with 50 years operation period.

http://vesti.ua/
Backimg

Archive